tysons at night copy.jpg
squarespace images.jpg
tysons at night copy.jpg

Helping engineers, developers and general contractors plan around what's underground™


COST SAVINGS OF $4 FOR EVERY $1 SPENT ON OUR SERVICES.
 

Connect with Us

SCROLL DOWN

Helping engineers, developers and general contractors plan around what's underground™


COST SAVINGS OF $4 FOR EVERY $1 SPENT ON OUR SERVICES.
 

Connect with Us

Industry leader with over 25 years' experience locating, mapping and protecting the Washington Metro area utility infrastructure.

SAFE, EFFICIENT SOLUTIONS 

LOCATE AND MAP UTILITIES, SURVEY, GPR, VIDEO PIPE INSPECTION, TRENCHLESS IN-LINE POINT REPAIR 

Providing all of the utility solutions you require usually within one week of Notice to Proceed


State transportation departments can reduce utility - related disruptions, minimize costs and accelerate construction. Studies have shown that subsurface utility engineering, for example, typically costs less than 0.5 percent of the total project construction costs, saves more than $4 for every $1 spent, and may reduce project delivery time by as much as 20 percent.
— U.S. Department of Transportation, Federal Highway Administration, Office of Infrastructure

WHAT WE DO

squarespace images.jpg

Awarded for Safety and Excellence


Awarded for Safety and Excellence